Bidford-on-Avon, Warwickshire. Mon to Fri.Certified to BRCGS Agents & Brokers, Grade AA01789 224228

Manufacturing services · Chapter G · Method 41

Assembly

Made through our partner network, confirmed on your quotation

How we supply this: made through our partner network, confirmed on your quotation.

Bringing moulded, machined and bought-in parts together, with inspection, packing and labelling, so you receive a finished product.

Assembly bench in a workshop.
Representative image: an assembly bench.
Heat sealing packaged parts.
Heat sealing packaged parts.

How it works

Assembly, step by step.

A labelled schematic of the process (not to scale), and the four steps every job goes through.

Labelled diagram showing how assembly works
Schematic · not to scale. Drawn by TCI Group.
STEP 01

Kit

Kit components against the bill of materials.

STEP 02

Assemble

Fit, fasten, bond or seal in fixtures.

STEP 03

Test & inspect

Check function and appearance.

STEP 04

Pack & label

Pack, label and record the batch.

Typical guide values

Confirmed on your quotation.

These are published industry values to help you plan. We confirm the figures for your part on your quotation.

ScopeLight assemblyThrough to finished goods
RecordsBatch traceabilityavailable on request
PackagingBranded optionsRetail or trade
VolumePrototype to repeatScalable
MaterialsMoulded silicone and rubber parts, plastics, metal frames, fasteners, packaging and labels.
FinishesFinished goods ready for sale, with packaging, inserts and barcodes as specified.
Design guidance
  • Design parts to locate positively.
  • Minimise fastener types and loose parts.
  • Agree inspection criteria before production.
Best suited toFinished consumer products, kits, framed mould trays and fulfilment-ready goods.
Watch-outsLabour is the main cost driver; design for assembly early.

More in chapter G

Other methods in Joining & assembly

Next step

Not sure this is the right route?

Send a sketch, photo, sample or CAD file with your quantity and target date. We will recommend the most sensible route and explain the trade-offs before quoting.

Reference figures are typical published industry values for planning, not a guarantee; final tolerances, materials and finishes are agreed in writing for each project. General process guidance, not a statement of TCI machine ownership or guaranteed capability. Feasibility, tolerances, materials, supplier responsibilities and validation requirements must be confirmed for each project.