Bidford-on-Avon, Warwickshire. Mon to Fri.BRCGS Grade AA certificated01789 224228

Manufacturing services · Chapter A · Method 04

Compression moulding

Core TCI route

A measured charge of rubber or silicone is placed in a heated steel tool and pressed closed until it cures. Robust, economical tooling for seals, mats and solid rubber parts.

Vertical rubber compression-moulding press with tool plates.
Vertical rubber compression-moulding press with tool plates. Representative process photo · Konglhask · CC BY-SA 4.0 · Wikimedia Commons
Servo-hydraulic compression-moulding press.
Servo-hydraulic compression-moulding press. Representative process photo · Sam D. Wilbur · CC BY-SA 4.0 · Wikimedia Commons

How it works

Compression moulding, step by step.

A labelled schematic of the process (not to scale), and the four steps every job goes through.

Labelled diagram showing how compression moulding works
Schematic · not to scale. Drawn by TCI Group.
STEP 01

Prepare charge

Weigh and cut pre-forms of uncured rubber or HCR silicone.

STEP 02

Load

Place the charge in the open, heated cavity.

STEP 03

Press & cure

Close the press under heat and pressure until cured.

STEP 04

Demould & deflash

Open, remove the part, deflash and post-cure if needed.

Reference figures

What to expect.

Typical industry values to help you plan. We agree the figures for your part on the drawing.

Tolerance±0.25 mmStandard; tighter by design
HardnessShore A 30–90Rubber and silicone
Volume100s– 100,000sTool life is long
ToolingSteel or aluminiumLower cost than injection
MaterialsHCR silicone, EPDM, nitrile (NBR), neoprene (CR), natural rubber, fluorocarbon (FKM); also thermoset composites.
FinishesTool-steel finishes from polished to bead-blasted or textured; flash line trimmed by hand or cryogenically.
Design guidance
  • Allow for a flash land and an overflow groove.
  • Keep sections even; thick sections lengthen cure times.
  • Specify which flash witness lines are cosmetic.
Best suited toGaskets, seals, keypads, mats, bowls, larger silicone parts and medium production runs.
Watch-outsManual loading adds cost per part; flash removal is a separate operation.

More in chapter A

Other methods in Silicone & rubber

Next step

Not sure this is the right route?

Send a sketch, photo, sample or CAD file with your quantity and target date. We will recommend the most sensible route and explain the trade-offs before quoting.

Reference figures are typical published industry values for planning, not a guarantee; final tolerances, materials and finishes are agreed in writing for each project.